|
LACCD Design Build Pre-qualified List - Master (Posted 8/20/10)
2010 Categorical Pre-qualification for Design Build Projects FAQ (Posted 7/9/10)
Measure J Project Snapshot (Posted
8/26/2010)
2010 LACCD Step 1 Categorical Pre-Qualification - Firms Submitting Statements of Interest (Posted 4/22/2010)
SAMPLE Step 3 Request for Proposal (Posted 4/12/2010)
FAQ District-Wide Prequalification 2010 (Posted 3/19/2010)
SAMPLE Step 2 Project Specific Pre-Qualification Questionnaire (Posted 3/2/2010)
Prequalification Statement of Interest (Posted 3/1/2010)
DESIGN-BUILD CONTRACT (Posted 3/1/2010)
GENERAL CONDITIONS OF THE DESIGN-BUILD CONTRACT (Posted 3/1/2010)
FAQ for Pre-Submittal Pre-Qualification Conference (Posted 4/6/09)
Sign in Sheet for Pre-Submittal Pre-Qualification Conference (Posted 4/6/09)
Business Cards for Pre-Submittal Pre-Qualification Conference (Posted 4/6/09)
|