West LA College

​West Los Angeles College is aiming to transform the campus into a state of the art 21st century educational institution. The goals of WLAC's construction program are to provide facilities that support and enhance the Educational Master Plan, improve outdoor gathering spaces, increase green space, enhance pedestrian access, remove vehicular traffic from the center of Campus, incorporate flexible teaching spaces and establish enhanced infrastructure and technologies for the future. Some of the most notable examples of facilities supporting WLAC's Educational Master Plan are the Science and Math Building with its accredited state of the art dental hygiene program, the new General Classroom and Student Services buildings, new parking structure, the pedestrian mall, and the new entrance to the campus via College Boulevard - a half-mile avenue connecting the campus to Jefferson Boulevard.


Hover over the interactive map below to view more information on several highlighted projects.

Featured Projects

See all College Projects

Watson Center 2

Watson Center 2

Watson Center 2

The 16,310 square-foot Watson Center includes new teaching stations, a sound stage with overhead catwalk, workshop, prop shop, costume lab, and faculty offices for the multi-tiered Motion Picture, Television and Stage Production Crafts Program. This unique pathway program covers the entire spectrum of specialized skills needed for a career in the entertainment industry. The new LEED certified building design incorporates useable outdoor instructional space into the building perimeter.

Technology Learning Center 2

Technology Learning Center

Technology Learning Center 2

The Technology Learning Center will house specialized computer labs, general computer labs, and offices for departments including Computer Science, Business & Paralegal, AFT, Academic Senate, Security, IT and Westside Extension. These spaces are supported by exterior instructional spaces and service spaces.


Active Projects




Sub Project Number Sub Project Title % Complete Academic Occupancy Date Progress Summary
09W-951.01 Technology Learning Center 2 24 % 06/15/2020 Construction in progress.
09W-948.00 Plant Facilities Center 99 % 07/22/2019 Construction in progress.
09W-982.00 Watson Center 2 19 % 01/06/2020 Construction in progress.

For more information on any of the projects listed above, please refer to the monthly dashboard report


* Only active projects are listed above. Projects in closeout and those considered 40J (i.e. ADA, Stormwater, etc) are not included above.

Project Fact Sheets


West Los Angeles College

       

Being Updated

APRIL 23, 2019

LATTC Showcases Green Economy Career Pathways at Earth Day Celebration

LATTC highlighted the sustainable, green-energy system in the 24th Street Parking Structure during its Earth Day celebration.

APRIL 8, 2019

Job Order Contracting ("JOC") Presentation Monday April 8, 2019 at 2:00 PM PDT

There will be a presentation for the referenced construction delivery method on Monday April 8, 2019 at 2:00 PM PDT at: East Los Angeles Community College 1301 Avenida Cesar Chavez Multi-Purpose Room (F5-201) Monterey Park, CA, 91754

  • Procurements
  • Outreach
  • Other
  • Multiple
date
list here

Interested in learning more?

Visit College Website

Explore other campuses

City
los-angeles-city-college-logo

City College

East
east-los-angeles-college-logo

East LA College

harbor2
los-angeles-harbor-college-logo

Harbor College

Mission
los-angeles-mission-college-logo

Mission College

Pierce
pierce-college-logo

Pierce College

Southwest
los-angeles-southwest-college-logo

Southwest College

Trade Tech
los-angeles-trade-technical-college-logo

Trade-Technical College

Valley
los-angeles-valley-college-logo

Valley College